What trade clients actually see on site

Three moments that decide whether a door schedule runs on time: the frame set-out before screeding, the hardware check against the door stile, and the pivot threshold level with the finished floor.

Door Connection for business

Frame set-out before screed

On townhouse runs we mark every opening from the same datum line. If the frame goes in after tiling, thresholds sit proud and the architrave has to be packed out.

Door Connection for business

Backset against the stile width

A 60mm backset will not sit in a narrow stile without splitting it. We check stile width per door type before the hardware pack leaves the yard.

Door Connection for business

Pivot threshold and floor level

Pivot units carry no standard hinges, so the rough opening and finished floor height have to be agreed before the tile bed goes down. Coastal sites get aluminium for a reason.

Why contractors and developers keep the same door supplier on the next phase

On a townhouse run, the door schedule is rarely the problem. The problem is a supplier who quotes one frame profile and delivers another, or ships handles with a 60mm backset that will not seat on a 100mm stile. Here is what tends to separate a workable supplier from a frustrating one.

One schedule, one point of contact

Send a door schedule with opening sizes, handings and finishes, and it comes back as a single line-item quote covering leaves, frames, architraves and hardware. No chasing three vendors for a frame that matches a leaf you already bought.

Sizing checked before dispatch

Standard 813mm and 914mm openings are routine. Custom widths, pivot rough openings and sliding pockets get measured against your set-out drawing first, because a pivot unit has to be positioned before the screed and tiles go down.

Materials matched to the site

Meranti and oak veneer for interior runs, powder-coated aluminium where coastal humidity or rainfall would keep swelling a timber exterior leaf. We will say so plainly when a cheaper option will cost you a re-hang in two years.

Hardware that matches across the house

Locksets, cylinders and lever handles grouped by finish and backset so a unit does not end up with three different satin nickel tones. Coastal projects get finishes that will not pit within a season.

Delivery planned around your trades

Doors arrive after painting and tiling are scheduled, not before, so leaves are not stacked in a wet unit. Bulk orders for townhouse phases are sequenced to the block that is actually ready to hang.

Fitting notes that hold up

Sealing all six faces of a meranti leaf, hinge screw depth, weather seal compression on an aluminium frame. Written notes your site team can follow without a phone call, plus care instructions for the handover pack.